logo

Within Reach

Haifa, Israel
Resedential

The project focuses on the design of the cable car station complex on Dori Road. The first phase of the project was the creation of an urban planning of the complex, which mainly concluded on the converting Dori Road to an underground tunnel, thereby creating the continuity of the existing neighborhood with nature, creating the public "yellow road" that connects to the surrounding trail, to the center of the complex and contained in the residential building I chose to develop.

The spaces of the building were designed taking into account two main encounters - the public and the private - a main public road that dominates several floors within a residential complex and semi-public encounters adjacent to the mountain. The second, artificial and natural encounter includes the preservation of the existing cliff and the creation of a dialogue within the range created by the offset-ed building, a new situation, for the residents, the observers, and passers-by through it.

עברית

הפרויקט מתמקד בתכנון מתחם תחנת הרכבל בדרך כביש דורי. השלב הראשון בפרויקט כלל תכנון עירוני כולל של המתחם שהסתכם בעיקרו בשיקוע כביש דורי וע"י כך יצירת המשכיות של השכונה הקיימת עם הטבע, יצירת דרך ציבורית "הדרך הצהובה" המתחברת לשביל מקיף נו"ש, למרכז המתחם ומוכלת במבנה המגורים אותו בחרתי לפתח.

חללי המבנה תוכננו בהתחשב בשתי מפגשים עיקריים – האחד הציבורי והפרטי – דרך ציבורית ראשית החולשת על מספר קומות בתוך מתחם מגורים ומפגשים סמי ציבוריים בצמוד הר. המפגש השני, המלאכותי והטבעי כולל את שמירת המצוק הקיים ויצירת דיאלוג בטווח שנוצר במבנה המוזח ממנו, סיטואציה חדשה, למתגוררים למתבוננים, לעוברים ולשבים דרכו.

View from the Yellow Brick Road

Yuanyang, Yunan, China | 2017

Existing Condition

Scheme

Semi-Public Space

Planned Condition

Process

Yellow Brick Road

plans_architecture_cliff_mountain_apartments-

Planned Condition

Main Section - East West

Neve Shannan neighborhood, Proposed Design